ecdpblog.blogspot.com
ECDP Building Blog: UPDATE: Construction Update (Sep.12.10)
http://ecdpblog.blogspot.com/2010/09/update-construction-update-sep1210.html
Sunday, September 12, 2010. UPDATE: Construction Update (Sep.12.10). We hope you enjoyed what was, G-d willing, ECDP's last Rosh HaShana in our existing sanctuary. The steel, joists and decking have been completed and the steel for the stairs is partially in place. Before Yom Kippur we intend, with G-d's help, to finish the stairs, complete the deck edging that forms the pan for the concrete and then pour concrete for the deck. Look for pictures and more updates later this week.
ecdpblog.blogspot.com
ECDP Building Blog: Moving Forward On a Bright Sunny Day
http://ecdpblog.blogspot.com/2010/09/moving-forward-on-bright-sunny-day.html
Wednesday, September 29, 2010. Moving Forward On a Bright Sunny Day. We are happy to report that with the sun comes our new floor. At 7:00 AM this morning the contractor arrived, by the time we say our tefilah upon exiting from the sukkah we expect the floor and the steps to the basement to be finished. 7am - Sun is shining, bring with it the opportunity to work on our new floor. Work continues on floor. Steps to the basement visible. October 11, 2012 at 7:50 AM. Subscribe to: Post Comments (Atom).
ecdpblog.blogspot.com
ECDP Building Blog: Footings, Windows, Opening for the Steps and Waterproofing
http://ecdpblog.blogspot.com/2010/05/footings-windows-opening-for-steps-and.html
Friday, May 21, 2010. Footings, Windows, Opening for the Steps and Waterproofing. Waterproffing on north side. Waterproofing on east side. It goes on with a spray gun. The hose from the pumper truck. Cleaning up before they apply waterproofing. There will be four windows in the new basement. There will be daylight (only durin the day.). See the vibrator to the right. The concrete goes in. The vertical rebar will be in the column base. A view from above. Check out the rebar. October 11, 2012 at 7:50 AM.
ecdpblog.blogspot.com
ECDP Building Blog: April 2010
http://ecdpblog.blogspot.com/2010_04_01_archive.html
Thursday, April 29, 2010. April 29th it is getting bigger. They started at 6:45AM and finished at 7:30PM. The underpinning of the existing foundation will begin I"Y on Monday. Tuesday, April 27, 2010. April 27th The hole in the ground. As you can see, the hole is getting bigger. Another few days and they will be ready to start setting forms. Monday, April 26, 2010. Sunday, April 25, 2010. Your Construction Manager at Work. Steve Socol, going over the details with our foundation contractors.
ecdpblog.blogspot.com
ECDP Building Blog: STEEL
http://ecdpblog.blogspot.com/2010/07/steel.html
Friday, July 9, 2010. All five are in. A few more feet. The last beam on the way. A view from the Social Hall floor. Ready to place number one. Things are looking up. Crane is ready to move steel. Setting the leveling plates. Thursday the crane showed up.and then a truckload of steel. Subscribe to: Post Comments (Atom). MEMBERSHIP APPLICATION [CLICK HERE]. ECDP DEDICATION LIST and DEDICATION OPPORTUNITIES [CLICK HERE]. Ethereal template. Powered by Blogger.
ecdpblog.blogspot.com
ECDP Building Blog: July 2010
http://ecdpblog.blogspot.com/2010_07_01_archive.html
Friday, July 9, 2010. All five are in. A few more feet. The last beam on the way. A view from the Social Hall floor. Ready to place number one. Things are looking up. Crane is ready to move steel. Setting the leveling plates. Thursday the crane showed up.and then a truckload of steel. Subscribe to: Posts (Atom). MEMBERSHIP APPLICATION [CLICK HERE]. ECDP DEDICATION LIST and DEDICATION OPPORTUNITIES [CLICK HERE]. Ethereal template. Powered by Blogger.
ecdpblog.blogspot.com
ECDP Building Blog: September 2010
http://ecdpblog.blogspot.com/2010_09_01_archive.html
Wednesday, September 29, 2010. Moving Forward On a Bright Sunny Day. We are happy to report that with the sun comes our new floor. At 7:00 AM this morning the contractor arrived, by the time we say our tefilah upon exiting from the sukkah we expect the floor and the steps to the basement to be finished. 7am - Sun is shining, bring with it the opportunity to work on our new floor. Work continues on floor. Steps to the basement visible. Friday, September 17, 2010. Because you asked- -Seating Capacity.
ecdpblog.blogspot.com
ECDP Building Blog: May 2010
http://ecdpblog.blogspot.com/2010_05_01_archive.html
Friday, May 21, 2010. Footings, Windows, Opening for the Steps and Waterproofing. Waterproffing on north side. Waterproofing on east side. It goes on with a spray gun. The hose from the pumper truck. Cleaning up before they apply waterproofing. There will be four windows in the new basement. There will be daylight (only durin the day.). See the vibrator to the right. The concrete goes in. The vertical rebar will be in the column base. A view from above. Check out the rebar. Another shot of the vibrator.
ecdpblog.blogspot.com
ECDP Building Blog: Because you asked---Seating Capacity
http://ecdpblog.blogspot.com/2010/09/because-you-asked-seating-capacity.html
Friday, September 17, 2010. Because you asked- -Seating Capacity. Q: What is the seating capacity of the new building? The new building's dimensions are 42' x 80'. In addition to the sanctuary, on the main floor there will be a new men's room, a new coat room and new lobby. We currently estimate seating capacity to be 250-300 persons. The final count will be determined by several factors including the size of and location of the bimah. As well as the ultimate type and size of the seating we use.