fortressydc.org
Financials — Fortress YDC
http://www.fortressydc.org/financials
Fort Worth, TX, 76104. Igniting a brighter future for urban youth by engaging them today and equipping them for tomorrow. Your Custom Text Here. Your support helps us foster relationships with and infuse hope in 105 kids and their families each and every day. Because of YOU, Fortress kids are growing up to be leaders, mentors, college graduates, and wonderful parents. It starts when they're kids; it continues when they return to enroll their own children. That's a powerful testimony! Providingoversight a...
ldaarch.blogspot.com
LDA Architects Opinions: November 2010
http://ldaarch.blogspot.com/2010_11_01_archive.html
Monday, November 1, 2010. Renovation vs. New Construction Saves Project and Reduces Cost by $2M. Renovation vs. new construction saves project and reduces cost by $2M. The construction time was reduced to meet the required move in date needed to start production. Birds Eye View of Completed Project. Larsen Dye Associates Architects. The owner needed to have the facility in operation within 10 months and the construction budget needed to be lowered by 25% to make the project work. Approved the work to beg...
ldaarch.blogspot.com
LDA Architects Opinions: Limited budget renovation for energy efficiency and flexible space.
http://ldaarch.blogspot.com/2010/09/limited-budget-renovation-for-energy.html
Wednesday, September 15, 2010. Limited budget renovation for energy efficiency and flexible space. With a limited budget, the owner renovated two adjoining older buildings. The venue space needed to be energy efficiency and create a flexible space. The business needed to stay open while the renovation and expansion project was being completed. The adjacent vacant space could be used to transition the work areas. The two buildings were constructed at different times. When exploratory demolition occurr...
ldaarch.blogspot.com
LDA Architects Opinions: Renovation vs. New Construction Saves Project and Reduces Cost by $2M.
http://ldaarch.blogspot.com/2010/11/renovation-vs-new-construction-saves.html
Monday, November 1, 2010. Renovation vs. New Construction Saves Project and Reduces Cost by $2M. Renovation vs. new construction saves project and reduces cost by $2M. The construction time was reduced to meet the required move in date needed to start production. Birds Eye View of Completed Project. Larsen Dye Associates Architects. The owner needed to have the facility in operation within 10 months and the construction budget needed to be lowered by 25% to make the project work. Approved the work to beg...
deotte-eng.com
Clients - City of Fort Worth, Dallas, North Texas, TXDOT
http://www.deotte-eng.com/clients.php
City of Fort Worth. Texas Department of Transportation (TxDOT). Buffalo Independent School District. Fort Worth Botanic Gardens. Frank Neal and Associates. James DeOtte Engineering Inc. has numerous satisfied clients throughout the Fort Worth and Dallas Metroplex and beyond. It is our goal to continue delivering a finished product to our current and future client base. James DeOtte Engineering, Inc. 2201 Dottie Lynn Parkway Suite 119. Fort Worth, Texas 76120. Ph: 817-446-6877 fax: 817-930-0445.
ldaarch.blogspot.com
LDA Architects Opinions: September 2010
http://ldaarch.blogspot.com/2010_09_01_archive.html
Wednesday, September 15, 2010. Limited budget renovation for energy efficiency and flexible space. With a limited budget, the owner renovated two adjoining older buildings. The venue space needed to be energy efficiency and create a flexible space. The business needed to stay open while the renovation and expansion project was being completed. The adjacent vacant space could be used to transition the work areas. The two buildings were constructed at different times. When exploratory demolition occurr...
ldaarch.blogspot.com
LDA Architects Opinions: Renovation Of Commercial Buildings Requires Creativity And Endurance.
http://ldaarch.blogspot.com/2010/02/renovation-of-commercial-buildings.html
Tuesday, February 23, 2010. Renovation Of Commercial Buildings Requires Creativity And Endurance. The renovation of commercial buildings requires creativity and endurance by the owner and architect. The building was doomed by engineering reports. The rear or west exterior wall and the phase 3 addition of the toilets were deteriorated to the point that they could not be reused or stabilized structurally. The roof trusses and interior partitions were removed as the abatement proceeded. The interior...The o...
ldaarch.blogspot.com
LDA Architects Opinions: February 2010
http://ldaarch.blogspot.com/2010_02_01_archive.html
Tuesday, February 23, 2010. Renovation Of Commercial Buildings Requires Creativity And Endurance. The renovation of commercial buildings requires creativity and endurance by the owner and architect. The building was doomed by engineering reports. The rear or west exterior wall and the phase 3 addition of the toilets were deteriorated to the point that they could not be reused or stabilized structurally. The roof trusses and interior partitions were removed as the abatement proceeded. The interior...The o...