hotsulphurwater.blogspot.com
HSW Announcements and News: Tough Rock will Require Blasting
http://hotsulphurwater.blogspot.com/2010/06/tough-rock-will-require-blasting.html
Saturday, June 26, 2010. Tough Rock will Require Blasting. The construction crew ran into unexpectedly hard rock at the tank site last week,so plans are being re-worked to use explosives to help excavate the bench for the new water tank. Garney has assembled the top-notch team of Yenter Construction to do the drilling and blasting under the guidance of Gordon Reavy. Week of 28June drilling on site. July 1 evening informational community meeting at ToHSS Town Hall with blasting consultant Sara Nation.
hotsulphurwater.blogspot.com
HSW Announcements and News: July 2010
http://hotsulphurwater.blogspot.com/2010_07_01_archive.html
Monday, July 26, 2010. Tank Site Blasting is Completed. Yenter has completed blasting and Garney has hauled most of the excavated material off site, leaving this nice rock bench almost ready for forming our tank foundation. Lots of hard work is paying off! Posted by Core Project Team. Monday, July 19, 2010. New Water Filter Arrives! The Town of Hot Sulphur Springs is the proud new owner of a state-of-the-art Siemens water filter! This photo shows the tight fit through the garage-style door (careful now!
hotsulphurwater.blogspot.com
HSW Announcements and News: November 2010
http://hotsulphurwater.blogspot.com/2010_11_01_archive.html
Monday, November 15, 2010. Ribbon Cutting Ceremony - Nov. 13, 2010. Mayor Hershal Deputy presided over the Ribbon Cutting Ceremony and Open House for the new Water Treatment Plant on Saturday, Nov. 13. Around 50 people attended and enjoyed speeches, tours, snacks and WATER. Keys to the Town of Hot Sulphur Springs were given to Curt Thompson - Engineer; Ed Duerr - Engineer; Andy Poirot - Colorado Department of Health and Environment; Geoff. Commemorative cups from the event are available at Town Hall.
hotsulphurwater.blogspot.com
HSW Announcements and News: Final Inspection Passed
http://hotsulphurwater.blogspot.com/2011/06/final-inspection-passed.html
Friday, June 17, 2011. We Passed Final Inspection. CDPHE Engineer Andy Poirot has approved our final inspection, closing out this ARRA project on time and within budget. At our peak we had 18 people working on this project, including the Garney Construction team that rented rooms from the Stagecoach Inn for the season, giving the town an additional shot in the arm during some difficult economic times. Program Manager, Geoff Elliott and His Team. Posted by Core Project Team. View my complete profile.
hotsulphurwater.blogspot.com
HSW Announcements and News: Wrapping up the ARRA Project for 2010
http://hotsulphurwater.blogspot.com/2010/12/wrapping-up-arra-project-for-2010.html
Tuesday, December 21, 2010. Wrapping up the ARRA Project for 2010. We are working toward a year end wrap up for the ARRA Stimulus Project in Hot Sulphur Springs. The Town formally accepted the construction projects (intake, water filter, pre-treatment, and water tank) as final on December 13, 2010 which starts the 1-year warranty period. The construction contractor, Garney Companies has given us the last construction invoice bringing them to 100%. The Notice of Final Payment (attached).
hotsulphurwater.blogspot.com
HSW Announcements and News: October 2010
http://hotsulphurwater.blogspot.com/2010_10_01_archive.html
Saturday, October 23, 2010. Water Plant is Completed. Our water treatment plant is now fully operational and producing wonderful fresh water. Mayor Hershal Deputy (left) and Stimulus Program Manager Geoff Elliott share a proud drink. We will host a ribbon cutting ceremony Saturday, November 13 at 11:00 at the new water treatment plant. Please join us for snacks and a glass of cool, clear, water – all you can drink! Posted by Core Project Team. Friday, October 15, 2010. Posted by Core Project Team.
hotsulphurwater.blogspot.com
HSW Announcements and News: New Water Filter Arrives!
http://hotsulphurwater.blogspot.com/2010/07/new-water-filter-arrives.html
Monday, July 19, 2010. New Water Filter Arrives! The Town of Hot Sulphur Springs is the proud new owner of a state-of-the-art Siemens water filter! In the photo on the left, local crane operator Paul MacDonald (Sky Crane of Granby) helps our Garney team move the filter off the truck and into the new building. This photo shows the tight fit through the garage-style door (careful now! Posted by Core Project Team. To receive an email every time this page is updated click here. View my complete profile.
hotsulphurwater.blogspot.com
HSW Announcements and News: June 2010
http://hotsulphurwater.blogspot.com/2010_06_01_archive.html
Wednesday, June 30, 2010. NOTICE OF BLASTING ACTIVITY. This is to notify interested parties that blasting activity will take place at:. Hot Sulphur Springs Water Tank. Hot Sulphur Springs, Colorado. Blasting will commence on: Monday, July 5, 2010. Blasting will continue through: Friday, July 16,2009. Prior to each detonation there will be a five-minute and then a one-minute pre-blast warning signal. After each blast there will be an all-clear signal. If you have any questions, please contact:. The constr...
hotsulphurwater.blogspot.com
HSW Announcements and News: Ribbon Cutting Ceremony - Nov. 13, 2010
http://hotsulphurwater.blogspot.com/2010/11/ribbon-cutting-ceremony-nov-13-2010.html
Monday, November 15, 2010. Ribbon Cutting Ceremony - Nov. 13, 2010. Mayor Hershal Deputy presided over the Ribbon Cutting Ceremony and Open House for the new Water Treatment Plant on Saturday, Nov. 13. Around 50 people attended and enjoyed speeches, tours, snacks and WATER. Keys to the Town of Hot Sulphur Springs were given to Curt Thompson - Engineer; Ed Duerr - Engineer; Andy Poirot - Colorado Department of Health and Environment; Geoff. Commemorative cups from the event are available at Town Hall.