lhc-cp.web.cern.ch lhc-cp.web.cern.ch

lhc-cp.web.cern.ch

LHC-CP Portal

The main goals of the LHC-CP are to ensure that the Accelerator Control Systems meet the Operational Requirements for LHC Beams and are available as required by the LHC Project Schedule. The LHC-CP was established following a recommendation from the Controls - Operations Forum. Held in December 1999. It ran as an interdivisional project until the end of 2002 when the Controls and Industrial Automation Groups from PS, SL and LHC divisions were combined in the AB Controls Group. Updated 5th April, 2004.

http://lhc-cp.web.cern.ch/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR LHC-CP.WEB.CERN.CH

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

November

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Monday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 4.5 out of 5 with 13 reviews
5 star
7
4 star
6
3 star
0
2 star
0
1 star
0

Hey there! Start your review of lhc-cp.web.cern.ch

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

1 seconds

FAVICON PREVIEW

  • lhc-cp.web.cern.ch

    16x16

  • lhc-cp.web.cern.ch

    32x32

  • lhc-cp.web.cern.ch

    64x64

  • lhc-cp.web.cern.ch

    128x128

  • lhc-cp.web.cern.ch

    160x160

  • lhc-cp.web.cern.ch

    192x192

CONTACTS AT LHC-CP.WEB.CERN.CH

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
LHC-CP Portal | lhc-cp.web.cern.ch Reviews
<META>
DESCRIPTION
The main goals of the LHC-CP are to ensure that the Accelerator Control Systems meet the Operational Requirements for LHC Beams and are available as required by the LHC Project Schedule. The LHC-CP was established following a recommendation from the Controls - Operations Forum. Held in December 1999. It ran as an interdivisional project until the end of 2002 when the Controls and Industrial Automation Groups from PS, SL and LHC divisions were combined in the AB Controls Group. Updated 5th April, 2004.
<META>
KEYWORDS
1 baseline
2 commissioning
3 members
4 minutes
5 planning
6 controls projects
7 team
8 workshops
9 next project meeting
10 and rjl
CONTENT
Page content here
KEYWORDS ON
PAGE
baseline,commissioning,members,minutes,planning,controls projects,team,workshops,next project meeting,and rjl
SERVER
Microsoft-IIS/7.5
POWERED BY
ASP.NET
CONTENT-TYPE
iso-8859-1
GOOGLE PREVIEW

LHC-CP Portal | lhc-cp.web.cern.ch Reviews

https://lhc-cp.web.cern.ch

The main goals of the LHC-CP are to ensure that the Accelerator Control Systems meet the Operational Requirements for LHC Beams and are available as required by the LHC Project Schedule. The LHC-CP was established following a recommendation from the Controls - Operations Forum. Held in December 1999. It ran as an interdivisional project until the end of 2002 when the Controls and Industrial Automation Groups from PS, SL and LHC divisions were combined in the AB Controls Group. Updated 5th April, 2004.

INTERNAL PAGES

lhc-cp.web.cern.ch lhc-cp.web.cern.ch
1

LHC-CP Portal

http://lhc-cp.web.cern.ch/lhc-cp/Team.htm

Members contributing directly to the LHC-CP effort are:. Maria Elena Angoletta - Scientific Secretary. Axel Daneels - Planning and Installation Coordination. Mike Lamont - Control Room Software and Operational Needs. Robin Lauckner - Coordination and Chair. These pages are maintained by NB.

2

LHC-CP Portal

http://lhc-cp.web.cern.ch/lhc-cp/Members.htm

Maria Elena Angoletta - AB. Ronny Billen - AB. Alastair Bland - AB. Nicole Boimond-Lopez - AB. Jacky Brahy - AB. Etienne Carlier - AB. Pierre Charrue - AB. Edmond Ciapala - AB. Pierre Dahlen - AB. Axel Daneels - AB. Laurent Deniau - AT. Franck Di Maio - AB. Bertrand Frammery - AB. Richard Gavaggio - AT. Philippe Gayet - AB. Paulo Gomes - AT. Jean-Jacques Gras - AB. Alain Hilaire - AT. Quentin King - AB. Mike Lamont - AB. Robin Lauckner - AB. Isabelle Laugier - AT. Herve Milcent - AB. Maciej Peryt - AB.

3

LHC-CP Portal

http://lhc-cp.web.cern.ch/lhc-cp/default.htm

The main goals of the LHC-CP are to ensure that the Accelerator Control Systems meet the Operational Requirements for LHC Beams and are available as required by the LHC Project Schedule. The LHC-CP was established following a recommendation from the Controls - Operations Forum. Held in December 1999. It ran as an interdivisional project until the end of 2002 when the Controls and Industrial Automation Groups from PS, SL and LHC divisions were combined in the AB Controls Group. Updated 5th April, 2004.

4

LHC-CP Portal

http://lhc-cp.web.cern.ch/lhc-cp/Minutes

6 May, 2003. Signals Project - Goals and Milestones for Phase I, LHC Test Benches, AB/CO/IN support for Test Benches. 18th February, 2003. GPRS Tests, Reports from Signals Working Group. 28th January, 2003. QRL Review, QRL Controls/Communications Issues, AB-CO Responsibilities, QRL Controls Coordination/Scheduling and Issues. 3rd December, 2002. Introduction to the IT-CS Group, Accelerator Network Upgrade Project, LHC Network Configuration, Real Time, Status Report on the Test Bench in SM18. 9th October,...

5

LHC-CP Portal

http://lhc-cp.web.cern.ch/lhc-cp/NextMeeting.htm

Le prochain LHC-CP Meeting aura lieu mardi 6 mai, 16h00, bât. 936 R-030. 1Matters arising and previous minutes* - R. Lauckner. 2 LHC Test Benches - A. Rijllart. 3 AB/CO/IN support for the Test Benches - P. Charrue. 4 Signals Project - Goals and Milestones for Phase 1 - J. Serrano. Toutes les personnes interessees sont les bienvenues. Minutes at http:/ cern.ch/lhc-cp/Minutes/Minutes33.pdf. These pages are maintained by NB.

UPGRADE TO PREMIUM TO VIEW 5 MORE

TOTAL PAGES IN THIS WEBSITE

10

LINKS TO THIS WEBSITE

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Workshop

http://proj-cmw.web.cern.ch/proj-cmw/workshop/workshop.html

CERN PS/SL WORKSHOP ON MIDDLEWARE TECHNOLOGY. March 26, 1999. VBaggiolini, F.DiMaio, K.Kostro, A.Risso, M.Vanden Eynden. All Slides in pdf. The PS/SL Middleware in its context, Definition of Middleware, Families of Middleware. CERN PS/SL Java API. Description of the Accelerator Device Model and Java API Capabilities. Object Request Broker Middlewares. Overview of CORBA architecture and services. Overview of MS (D)COM architecture and services, comparison with CORBA. Java RMI and Enterprise Java Beans.

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

News

http://proj-cmw.web.cern.ch/proj-cmw/news.htm

A collaboration started with ST to develop a PVSS driver for CMW. The objective is to allow the surveillance of some of PS equipment from ST Scada synoptic displays. The newly developed C RDA client will be used for this. Slavek Maludzinski with Nikolai developed the RDA client side in C . Potential users: SP, Passerelle PS Motif applications and TOF. A prototype of the Biscoto CMW servers was developed by Kris. The paper describing RDA. Has been presented at ICALEPCS. At the LHC-CP meeting. It has been ...

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Development

http://proj-cmw.web.cern.ch/proj-cmw/development/index.htm

These links are for developers. Some of the documentation is internal for CMW development team. For the overview documentation visit the documentation link on the CMW home page. March 2002. This is the first implementation of CMW Logging. Developed by Roland Svoboda and based on log4j. CMW version 1.0. Common CMW Java classes. CMW version 0.11. October 2001 (new package structure, RDA fast update, DB device directories). Software User Manual (SUM) DRAFT 7. Still to be improved). CMW sources cmw.zip.

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Activities

http://proj-cmw.web.cern.ch/proj-cmw/management/activities.htm

The CMW project has reached almost all of it's initial goals. Nevertheless improvements and extensions are often necessary. In following we list the major ones which are being worked on. Please note that the Minutes of project meetings. Give a detailed and up-to-date account of the progress of these activities. RDA version 2.0. To other accelerator areas. Another use of C RDA client is in replacing NC RPC by CMW in PC Motif applications such as the Working Set.

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

The team

http://proj-cmw.web.cern.ch/proj-cmw/team.htm

The current core CMW team. Is composed as follows:. Vito Baggiolini, Francesco Calderini, Francois Chevrier, Steen Jensen, Kris Kostro, Nikolai Trofimov, Jens Andersson. The project leader is Kris Kostro. Slawek Maludzinski is a technical student working on C CMW client implementation and client uses of C . Other members of the SL, PS, LHC and ST divisions were participating in the requirements definition and such greatly contributed to the project.

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Minutes of project meetings

http://proj-cmw.web.cern.ch/proj-cmw/minutes/minutes.htm

Minutes from project meetings. This is the list of minutes from regular project meetings. There is also archive of mail messages related to MW, and a list of other, related meeting minutes. Some of the older minutes have been converted from mail and are in text format. Minutes of MW meeting 31 Jan 2003. Minutes of MW meeting 17 Jan 2003. Minutes of MW meeting 29 Nov 2002. Minutes of MW meeting 5 Nov 2002. Minutes of MW meeting 18 Oct 2002. Minutes of MW meeting 27 Sep 2002. Meeting99 08 02.txt. Meeting99...

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Architecture

http://proj-cmw.web.cern.ch/proj-cmw/architecture.htm

The Middleware architecture has been explained in the Whitepaper. The original architecture drawing. Presented in this paper is still valid. The API's and components which will be developed by CMW project until the end of the year are depicted in another architecture drawing. With the user written parts in blue, the middleware parts in green and commercial parts in brown. It has to be stressed that the middleware user sees only the public API's: the client API and Device Server Framework API. The device ...

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Industrial

http://proj-cmw.web.cern.ch/proj-cmw/industrial.htm

Integration of Industrial Systems. Industrial components and turn-key solutions are used increasingly in control systems. PLC's are widely accepted as cost-effective way of controlling equipment. SCADA systems are often an integral part of a large subsystem (cryogenics, electrical system). These systems have to be integrated in the control system. The middleware project decided to use OPC. Modified 13/10/00 . For comments send email to Kris.Kostro@cern.ch.

proj-cmw.web.cern.ch proj-cmw.web.cern.ch

Documents

http://proj-cmw.web.cern.ch/proj-cmw/documents.htm

Middleware documents and presentations. All CMW APIs are fully documented as JavaDoc or with Doxygen (Java style) for C APIs. The Software User Manual (SUM) is about to be completed and a draft version. Which includes programming examples is available. Common CMW Java classes. Simple Java client examples. RDA API for C clients and servers. In addition to this more documentation, some APIs internally used by CMW or for prototype implementations, can be consulted in the Development. Presented at SL/CO disc...

UPGRADE TO PREMIUM TO VIEW 3 MORE

TOTAL LINKS TO THIS WEBSITE

12

OTHER SITES

lhc-constructora.com lhc-constructora.com

Construction in Costa Rica, Development of residential and commercial projects, Remodeling, General maintenance, Architectural, mechanical, and structural design. Free estimates. Real Estate, house and lots for sale.

A pleasant and efficient. Thank you for your interest in our company. For LHC Constructora, attention to our clients is of the utmost importance. With over 25 years of experience in the construction field, Luis Hernández Castro founded his own enterprise in 2002 to provide both Costa Ricans and newcomers to Costa Rica a pleasant and efficient construction experience. At LHC Constructora we specialize in both residential and commercial building projects. Architectural, mechanical,. Guidance in the purchase.

lhc-consulting.com lhc-consulting.com

Lausanne Hospitality Consulting :: : Home

Proficiency in Hospitality Management Certification. Development of Learning Centres. Vocational Education Recognition - hotelleriesuisse. Higher Education Certification - EHL. Management and Faculty Training. EHL Summer Academy 2015: Experience one week at EHL. EHL Executive Education 2015 - Don't miss the last seats available for June Programmes. I don t want to be an instructor anymore I want to be a facilitator of knowledge. HIT Scotland scholars visit Lausanne Hospitality Consulting at EHL.

lhc-consulting.de lhc-consulting.de

LHC Consulting

Unternehmensziele Strategie Beratung Coaching Schulung Referenzen Jobs Über uns Kontakt. Die Hotellerie und Gastronomie ist im Umbruch. Erfolg hat heute nur derjenige, der alle Umsatzpotenziale seines Betriebes erkennt, diese konsequent und professionell nutzt. Wir sind Ihr Partner beim Erreichen dieser Ziele. Deutliche und nachhaltige Umsatz- und Kostenverbesserung Ihres Betriebe. Maximale Nutzung vorhandener Ressourcen. Kostenbewusste, zielgerichtete Vermarktung Ihres Betriebes. Nutzen Sie unsere langj...

lhc-consulting.net lhc-consulting.net

Oktoberfest Perú

lhc-cottbus.de lhc-cottbus.de

Startseite

Wir arbeiten zur Zeit an der Neuerstellung unserer Webseite. In Kürze erhalten Sie hier wieder alle Informationen zum Lausitzer Handball Club Cottbus!

lhc-cp.web.cern.ch lhc-cp.web.cern.ch

LHC-CP Portal

The main goals of the LHC-CP are to ensure that the Accelerator Control Systems meet the Operational Requirements for LHC Beams and are available as required by the LHC Project Schedule. The LHC-CP was established following a recommendation from the Controls - Operations Forum. Held in December 1999. It ran as an interdivisional project until the end of 2002 when the Controls and Industrial Automation Groups from PS, SL and LHC divisions were combined in the AB Controls Group. Updated 5th April, 2004.

lhc-cpa.com lhc-cpa.com

Leona H. Chan, CPA: A professional tax and accounting firm in Hopewell Junction, New York: Home

Leona H. Chan, CPA 許潔麗 註冊會計師. Accounting and Tax Consulting. Leona H. Chan, CPA. Accounting and Tax Consulting. Intuit Online Payroll (IOP). New York City Office. Thank you for visiting our website. Leona H. Chan, CPA is a full-service accounting and tax consulting firm serving clients throughout the Hudson Valley and New York area, dedicated to providing our clients with professional, personalized services and guidance in a wide range of financial and business needs. Leona H. Chan, CPA.

lhc-data-exchange.web.cern.ch lhc-data-exchange.web.cern.ch

LHC Experiment Machine Data Exchange Working Group (LEADE)

This page uses frames, but your browser doesn't support them.

lhc-dipcoor.web.cern.ch lhc-dipcoor.web.cern.ch

Coordination of LHC Cryodipoles

Coordination of LHC Cryodipoles. Cold tests with A/C. Assembly rates per Firm. Welcome to the new dipcoor site. Now that the LHC cryodipoles production is concluded, this Coordination site was renewed to provide relevant information for future needs.

lhc-distribution.com lhc-distribution.com

FiveStar StarLoc Adhesives glues and model distribution, Cyanoacrylate epoxy, anaerobic thredalockers , industrial and model/hobby adhesives, paints , fuels and dopes plus a range of other model hobby and craft kits and accessories from fmk and the miniatu

Trade suppliers/distributors We displayed at the the Spielwarenmesse Nurnburg,2005,2006,2007,2008,2009. For trade supplies contact us NOW. FOR USER OR RETAIL SALES, BUY ONLINE.NOW! Universal bonding adhesive for all surfaces, metals ALL plastics etc, The adhesive for polyethylene, polypropylene, silicone, delrin to themselves or any other surface! Model, hobby and craft products. Laser cut model kits. StarSpan Tissue model coverings and cellulose dope. TEL/FAX UK 0151 733 7182.

lhc-div-mms.web.cern.ch lhc-div-mms.web.cern.ch

lhc-div-mms.web.cern.ch - /lhc-div-mms/

Lhc-div-mms.web.cern.ch - /lhc-div-mms/. 1/13/2015 12:22 PM dir borders. 1/13/2015 12:22 PM dir private. 10/18/2011 9:43 AM dir vti txt. 10/18/2011 9:43 AM dir cgi-bin. 1/13/2015 12:26 PM dir counter. 1/13/2015 10:36 AM dir counterb. 1/13/2015 12:30 PM dir dipole assembler. 1/13/2015 12:32 PM dir Electrical Controls. 1/13/2015 10:37 AM dir fpdb. 1/13/2015 12:34 PM dir Geometry working unit. 1/23/2017 11:46 AM 3186 Global.asax. 1/13/2015 10:55 AM dir Inspectors. 1/13/2015 10:58 AM dir InterConnect.