hydromax.net
HydroMax - "Specializing in Pure Water Solutions"
http://www.hydromax.net/rev.htm
Wastewater Treatment and Recycling. Reverse Osmosis . Reverse Osmosis Process Theory. Calculating the Cost of DI Exchange Tank Operation. Each HydroMax reverse osmosis system is fully performance tested prior to leaving the factory. Stringent quality control and attention to preparation details ensures that every HydroMax reverse osmosis system is ready to operate upon installation. HydroMax welcomes traditional applications for reverse osmosis technology and will gladly explore the suitability of this ...
hydromax.net
HydroMax - "Specializing in Pure Water Solutions"
http://www.hydromax.net/water.htm
Wastewater Treatment and Recycling. From design concept through equipment manufacturing, installation and on-going system maintenance, HydroMax, Inc. provides personalized attention and expert technical assistance to insure the completed ultra-pure water production and distribution process meets every customer requirement. Please contact us when you are ready to experience.
hydromax.net
HydroMax - "Specializing in Pure Water Solutions"
http://www.hydromax.net/ultra.htm
Wastewater Treatment and Recycling. Ultra-Pure Water Systems Ultra-Pure Water System Process. To provide ultra-pure water solutions for your process that you only dreamed possible. HydroMax. Has a reliable, efficient, cost effective water purification solution for you. Call HydroMax. Today and wake up tomorrow knowing your pure water problems are solved! AAMI Hemodialysis Grade Water. ASTM Reagent Grade Water. ASTM Electronics Grade Water. CAP Reagent Grade Water. Central Ultra-Pure Water Systems.
hydromax.net
HydroMax - "Specializing in Pure Water Solutions"
http://www.hydromax.net/rfq.htm
Wastewater Treatment and Recycling. You may request a quote by sending your requuirements by any of the following methods. Check back soon for the ability to request a quote directly on-line. Emmitsburg, MD 21727 USA. Emmitsburg, MD 21727 USA.
safetysling.com
Nylon Web Slings Care and Use. Offered by Safety Sling Company
http://www.safetysling.com/ws1.htm
Care and Use of Nylon Web Slings. 8226; Introduction to Nylon Web Slings. 8226; Rated Capacities of Nylon Web Slings. Determine weight of the load. Select sling having suitable characteristics for the type of load, hitch and environment. Slings shall not be loaded in excess of the rated capacity. Consideration should be given to sling angles, which are discussed below. Slings with fittings used in a choker hitch shall be of sufficient length to assure that the choking action is on the webbing. A) Nylon i...
safetysling.com
Criteria for Selecting Wire Rope by Safety Sling
http://www.safetysling.com/wr1.htm
Criteria for Selecting Wire Rope. 8226; Introduction to Wire Rope. 8226; Care and Use of Wire Rope. 8226; Wire Rope Specifications. Several factors must be considered when attempting to select the most suitable type of wire rope for a job. An accurate assessment of the following requirements will help attain optimum performance and extend the useful life of wire rope. StrengthResistance to breaking. Resistance to bending fatigue. Resistance to vibrational fatigue. 1 Strength-Resistance to breaking.
pmpco.com
Normalizing by Pittsburgh Metal Processing
http://www.pmpco.com/normalizing/normalizing.html
1850 Chapman Street Pittsburgh, PA 15215-2791. 412) 781-8053 Fax (412) 781-8185 Email: pmpheat@aol.com. NORMALIZING (1600 - 1800°F). Alloy Cast Steel Pipe Elbow for Normalizing (4’0”Hx12’0”L and 7500 lbs.). Pittsburgh Metal Processing Co., Inc. 1850 Chapman Street PO Box 7824 Pittsburgh, PA 15215-2791. In PA: (412) 781-8053. Outside PA (800) 323-7331. Site Design by OnTech.
pmpco.com
Stress Relieving by Pittsburgh Metal Processing
http://www.pmpco.com/stress_relieving/stress_relieving.html
1850 Chapman Street Pittsburgh, PA 15215-2791. 412) 781-8053 Fax (412) 781-8185 Email: pmpheat@aol.com. STRESS RELIEVING: (300 - 1400°F). Thermal Stress Relieving is generally applied to metallic materials that have been cold-worked, formed, machined, flame-cut, or weld-fabricated to reduce residual stresses for dimensional stability or reduced risk of premature failure in service. ASME Section I: (900 - 1300°F). ASME Section VIII: (900 - 1300°F). AWS D1.1: (900 - 1200°F). Typically applied to Stainless ...
safetysling.com
Wire Rope Slings, Braided Wire Rope, Twin-Path Wire Rope Slings from Safety Sling Company
http://www.safetysling.com/wrs2.htm
Rated Capacities of Wire Rope Slings. 8226; Introduction to Wire Rope Slings. 8226; Care and Use of Wire Rope Slings. 1 Part Mechanical Splice Slings Constructed of 6 x 19 or 6 x 37 EIPS IWRC Wire Rope. Go to Online Catalog. Rated Capacities in Tons. Go to Online Catalog. Rated Capacities in Tons. 1 Part Mechanical Splice Slings Constructed of 6 x 19 or 6 x 37 EIPS IWRC Wire Rope. Go to Online Catalog. Rated Capacities in Tons*. Go to Online Catalog. Rated Capacities in Tons*. Go to Online Catalog.
safetysling.com
Wire Rope Slings by Safety Sling
http://www.safetysling.com/wrs1.htm
Care and Use of Wire Rope Slings. 8226; Introduction to Wire Rope Slings. 8226; Rated Capacities of Wire Rope Slings. Every Lift Uses 1 of 3 Basic Hitches. Hitches are made directly from the crane hook to the load. Full rated capacity of the sling may be used but never exceeded. A tagline should be attached to prevent rotation which can damage the sling. A sling with a hand-tucked splice can unlay and fail if the sling is allowed to rotate. Actual Sling Capacity = Factor x Rated Capacity. Rated capacity ...