Building a Majestic 45 with Wisdom Homes. July 17, 2014. Upper Eaves, Brick Clean and Air conditoning. We have reached 13 weeks of our build. We visited site today and there has been some movement. Bricks have been cleaned on the upper level. Loving the clean look. Airconditioning ducts have also been installed throughout the house. Upper level eaves have been completed awaiting painting. To our surprise the electrical tradespeople were on site today commencing on the electrical work throughout the house.
buildingourmajestic.blogspot.com
Building Our Majestic: September 2014
http://buildingourmajestic.blogspot.com/2014_09_01_archive.html
Building a Majestic 45 with Wisdom Homes. September 29, 2014. It has been a few weeks since my last post a lot has been happening although we will not meet the original date given which was October 11. We are currently still approx 4 weeks away for PCI. I can say that finally I feel like we are on the home stretch. This journey has been a very long one. An update since my last post, the following things have been completed. Tiling completed in wet areas,. First coat of paint went on last week(undercoat),.
buildingourmajestic.blogspot.com
Building Our Majestic: October 2014
http://buildingourmajestic.blogspot.com/2014_10_01_archive.html
Building a Majestic 45 with Wisdom Homes. October 30, 2014. Glass Splashback has been installed in the kitchen and butlers kitchen. The colour we selected is Gunmetal Glitz. A few exciting things have happened this week, we received our PCI letter to confirm our PCI for the 12th of November. Doors and staircase have been stained. Towel rails fitted to bathrooms. Few bad bricks have been replaced around house. October 24, 2014. Painting commenced on Thursday. Jobs left to do:. Door furniture/ towel rails.
buildingourmajestic.blogspot.com
Building Our Majestic: May 2014
http://buildingourmajestic.blogspot.com/2014_05_01_archive.html
Building a Majestic 45 with Wisdom Homes. May 29, 2014. May 21, 2014. Frame work completed today. All up it has taken 9 days for the frame to go up. Window colour : Monument. Front of the house. Inside leisure room looking out to alfresco. Missing roof on Main bedroom. May 1, 2014. Excavation, formwork and Slab. Subscribe to: Posts (Atom). Excavation, formwork and Slab. Driveway poured/ kitchen splashback. Pantry/linen and WIR Shelving. Main floor tiling completed. Main Floor tiling commenced.
buildingourmajestic.blogspot.com
Building Our Majestic: August 2014
http://buildingourmajestic.blogspot.com/2014_08_01_archive.html
Building a Majestic 45 with Wisdom Homes. August 29, 2014. Well we have officially been locked out. No more sticky beaking through the house. It happened all too quickly, tradies have been busy this week. Although we can't complain. Stairs were installed on Tuesday with a few hiccups, we have now agreed to disagree and continue construction, the stairs are slightly different to the display home although a strangers eye would not see any difference. Front Door with Translucent Glass. August 22, 2014.
buildingourmajestic.blogspot.com
Building Our Majestic: Post Settlement
http://buildingourmajestic.blogspot.com/2015/01/post-settlement.html
Building a Majestic 45 with Wisdom Homes. January 8, 2015. It's been a while since my last post, things have been quite busy around here and the kids are on school holidays aswell. It's great to finally be in here it was a very long and exhausting build process. We have commenced our pool build also and landscaping has been on hold until this project finishes. Some updated pics below, although more to come soon. Main Bedroom (temporary curtains). Pool Construction Concrete completed. I was wondering how ...
buildingourmajestic.blogspot.com
Building Our Majestic: Getting Closer...
http://buildingourmajestic.blogspot.com/2014/10/getting-closer.html
Building a Majestic 45 with Wisdom Homes. October 11, 2014. We can see the light at the end of the tunnel. (only just) . Things seem to be getting closer to moving into our brand new home. Its taking shape! This week we have had the main floor tiling completed, shower screens and mirrors installed. Forecast for next week rain just in time for our scheduled drive way. My list of things to do is getting slightly downsized. Things left to be completed:. Staircase- staircase staining and glass installation.
buildingourmajestic.blogspot.com
Building Our Majestic: A few extra's....
http://buildingourmajestic.blogspot.com/2014/11/a-few-extras.html
Building a Majestic 45 with Wisdom Homes. November 2, 2014. I managed to take a few pics of the freshly stained staircase and doors. Also the upstairs linen glass doors have also been fitted. We are approaching our inspection day 10 days to go. The last few weeks have been a drag. The slowest part of the build. Not long to go now. November 6, 2014 at 2:32 AM. Subscribe to: Post Comments (Atom). Driveway poured/ kitchen splashback. Pantry/linen and WIR Shelving. Main floor tiling completed. Building Our W...
buildingourmajestic.blogspot.com
Building Our Majestic: Driveway
http://buildingourmajestic.blogspot.com/2014/10/driveway.html
Building a Majestic 45 with Wisdom Homes. October 24, 2014. We have not heard from our SS and therefore unaware on how long we have left quite frustrating as things are taking forever and they are not communicating any dates. I had in mind that the house would be completed by 26 weeks? Kitchen splashback was installed (I will be back later for a separate post with pics). Painting commenced on Thursday. Jobs left to do:. Painting inside/outside(downpipes, lower eaves, front door). First Coat of paint.
buildingourmajestic.blogspot.com
Building Our Majestic: February 2014
http://buildingourmajestic.blogspot.com/2014_02_01_archive.html
Building a Majestic 45 with Wisdom Homes. February 28, 2014. Subscribe to: Posts (Atom). Driveway poured/ kitchen splashback. Pantry/linen and WIR Shelving. Main floor tiling completed. Main Floor tiling commenced. Toilets installed/ Electrical completed/Rangehood/ facade ballustrading. First Coat of paint. Benchtops installed/Waterproofing to Balcony. Wet areas tiling completed. Garage door installed,air conditioning vents cut out, staircase gyprocked. Rain Water Tank installed. Lower Level brick clean.