designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/while-we-were-waiting-for-bond-beam-to.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Friday, June 15, 2012. Subscribe to: Post Comments (Atom). PCER will add an energy independent gravity fed water supply to the school and remote internet technologies developed at the University of Michigan to prepare to expand the educational program to rural healthcare accommodations. The above design is one of two that will be constructed with the second still in design development. Pantanal Center for Research and Education.
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/top-we-decided-to-hitch-ride-on-back-of.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Friday, June 15, 2012. TOP) We decided to hitch a ride on the back of a materials truck to get from Pocone to the site (3.5 hour drive). The truck broke down and we spent 6 hours on the side of the road waiting for a mechanic and getting back on the road. Subscribe to: Post Comments (Atom). Pantanal Center for Research and Education. WEEK FIVE By the end of week five the build team. Installing the cages takes a fair amount of time .
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/this-year-team-of-engineering-students.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Saturday, June 16, 2012. Subscribe to: Post Comments (Atom). PCER will add an energy independent gravity fed water supply to the school and remote internet technologies developed at the University of Michigan to prepare to expand the educational program to rural healthcare accommodations. The above design is one of two that will be constructed with the second still in design development. Pantanal Center for Research and Education.
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/while-i-install-reinforcement-for-what.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Friday, June 15, 2012. While I install reinforcement for what is to be a cast in place concrete ceiling Alli and Chris fabricate the cages for the second tier bond beam. After pouring the Tier one bond be we removed the formwork which we will reuse for the third time to pour the Second tier columns. The bond beam looks great. Subscribe to: Post Comments (Atom). Pantanal Center for Research and Education. While I install reinforcement ...
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/in-mechanical-room-there-is-solar.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Saturday, June 16, 2012. In the mechanical room there is a solar charge converter, inverter, and battery that supplies the schools lighting and outlets. This system is designed to be easily expandable for growing demand. Subscribe to: Post Comments (Atom). Pantanal Center for Research and Education. WEEK FIVE By the end of week five the build team. Installing the cages takes a fair amount of time . In one bay of the water tower there ...
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/system-that-would-provide-internet.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Saturday, June 16, 2012. Subscribe to: Post Comments (Atom). PCER will add an energy independent gravity fed water supply to the school and remote internet technologies developed at the University of Michigan to prepare to expand the educational program to rural healthcare accommodations. The above design is one of two that will be constructed with the second still in design development. Pantanal Center for Research and Education.
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/after-allowing-for-bond-beam-and.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Friday, June 15, 2012. After allowing for the bond beam and ceiling slab to set we set up the form work which will be used for a third time for the second tier columns which are two meters tall. Because we can not stake braces to the ground, each column is braced to another to establish square and plumb. Subscribe to: Post Comments (Atom). Pantanal Center for Research and Education. WEEK FIVE By the end of week five the build team.
designbuildbrazil.blogspot.com
Design/Build Brazil 2010 + 2012
http://designbuildbrazil.blogspot.com/2012/06/solar-thermal-has-been-implemented.html
Design/Build Brazil 2010 2012. Systems and Strategies in the Pantanal. Saturday, June 16, 2012. Solar thermal has been implemented locally as a means to provide hot water which is currently used only for showers but has the potential to expand. Subscribe to: Post Comments (Atom). Pantanal Center for Research and Education. WEEK FIVE By the end of week five the build team. Installing the cages takes a fair amount of time . The form work for the second tier bond beam is c. The concrete slab that will act a...